ARENA puts A$15m into Hadean’s Victorian hydrogen pilot

The Australian Renewable Energy Agency (ARENA) has committed A$15 million to Hadean Energy’s A$30 million pilot green hydrogen plant in Victoria, gasworld reported on 5 November 2026. The grant covers half of the project cost.

At a glance

Item Detail Basis
Funding A$15m (about US$10.5m as reported) from ARENA ARENA, via gasworld
Total cost A$30m pv magazine Australia
Technology Tubular solid oxide electrolysis (SOEC), from CSIRO research Hadean
Output Up to 7 kg of hydrogen per hour ARENA, subject to final approvals
Site Hastings, south-east of Melbourne, Victoria Area News (AAP)

What the pilot is for

According to Area News, the plant is earmarked for a BOC facility near a steel manufacturing plant. It builds on an earlier trial of Hadean’s technology.

Hadean claims its system uses 30% less energy than conventional electrolysers, as it draws on waste industrial heat. That figure is the company’s own and the pilot is meant to test it in operation. ARENA chief executive Darren Miller said the project would show how the technology performs in an industrial setting and provide evidence to assess its commercial potential, pv magazine Australia reports.

Why it matters

The plant is small. Our calculation: 7 kg/h × 24 h = 168 kg per day if it ran continuously, which is a demonstration volume rather than industrial supply. gasworld says it is intended to cover 85% of the hydrogen needed for a steel annealing process, where the gas acts as a protective atmosphere during heat treatment.

Cost is a central issue. gasworld notes that high costs have hit many steelmakers pursuing hydrogen-based processes, citing ArcelorMittal’s decision to drop two projects in Germany and hurdles at Stegra’s project in Sweden. A lower electricity requirement per kilogram would address a major operating cost of electrolysis.

What to watch

Final approvals, which ARENA says the 7 kg/h output estimate depends on, and the start of construction at Hastings. Performance data on electricity use per kilogram will determine whether the technology moves beyond the pilot.

Sources

Header image: illustration, AI-generated.

Leave a Comment