Masdar marks completion of 173.7 MW California battery site
Masdar says its Terra-Gen venture has finished the $950 million Lockhart complex in San Bernardino County, pairing 365 MW of solar with 173.7 MW of battery storage.
Masdar says its Terra-Gen venture has finished the $950 million Lockhart complex in San Bernardino County, pairing 365 MW of solar with 173.7 MW of battery storage.
EIA operator-reported data show over 16% of US utility-scale solar added in 2026 through September sits beside batteries, up from 2% in 2017, with plans pointing above 30% in 2027 and 2028.